Construction Conversions

Cubic Feet to Cubic Yards for Construction

One cubic yard contains 27 cubic feet because a yard is three feet in each dimension: 3 × 3 × 3 = 27. Divide cubic feet by 27 to get cubic yards; multiply cubic yards by 27 to return to cubic feet.

QUICK ANSWER

The short version

Divide cubic feet by 27 to get cubic yards. The relationship is exact because one yard is three feet and 3 × 3 × 3 = 27 cubic feet per cubic yard.

QUICK CHECKLIST

Five checks before trusting an estimate

  • Cubic feet and cubic yards are volume units.
  • Cubic yards = cubic feet ÷ 27.
  • Avoid rounding intermediate geometry before the unit conversion.
  • A cubic yard does not have one universal weight.
  • Excavated, loose, and compacted volumes can differ even when the unit is the same.
PUBLISHING INFO

About this guide

Published: September 23, 2026

Last reviewed: September 23, 2026

Published by BuildYard. The guide reflects BuildYard's calculation methodology and editorial standards and does not replace project-specific professional advice.

Use volume, not area

Cubic feet and cubic yards are volume units.

If the starting measurement is square feet, include material depth before converting.

Divide by 27

Cubic yards = cubic feet ÷ 27.

For example, 270 cubic feet equals 10 cubic yards.

Keep precision until ordering

Avoid rounding intermediate geometry before the unit conversion.

Round at the supplier's actual sales unit after allowances are applied.

Do not confuse volume with weight

A cubic yard does not have one universal weight.

Material density, moisture, gradation, and compaction determine weight.

Label the material state

Excavated, loose, and compacted volumes can differ even when the unit is the same.

Record whether the quantity is bank, loose, or placed volume.

KEEP READING

Related guides

All guides
BUILDYARD REFERENCE EXAMPLE

270 cubic feet of material

Pure unit conversion before waste, compaction, settlement, or supplier rounding.

StepResult
Starting volume270 cu ft
Conversion270 ÷ 27
Cubic yards10.00 cu yd
ProcurementApply material-specific adjustments afterward
SOURCE NOTES

References used for this guide

VERIFY BEFORE ORDERING

Use project-specific information first

Current manufacturer data, supplier specifications, drawings, field measurements, applicable codes, permit requirements, and qualified professional guidance can take priority over a general-purpose planning estimate.