Define hole geometry
Use actual hole diameter and concrete-filled depth for each post type.
Corner, gate, terminal, and line posts can require different holes, so estimate them separately when dimensions differ.
Subtract post displacement
A post occupying the concrete zone reduces the concrete volume.
Use the actual post width or diameter and only the embedded length that overlaps the concrete.
Multiply by post count
Group identical holes and calculate each group once.
Do not let gate hardware or brace posts disappear inside a generic waste percentage.
Use package yield
Convert the adjusted cubic-foot requirement with the exact yield of the selected concrete product.
Fast-setting products can have different package sizes and instructions from standard concrete mix.
Round and verify
Round up to whole bags after all hole groups and allowances are combined.
Hole depth, frost requirements, soil conditions, and structural loads remain project-specific.