Build an elevation schedule
Measure each wall rectangle and gable triangle independently.
Keep siding, masonry, stucco, trim, doors, soffits, and other coating systems separate.
Subtract major openings
Large windows and doors reduce field area, but their casing and trim may create separate paint quantities.
Do not subtract openings from one coating while forgetting their replacement trim area in another.
Apply coats by coating system
Multiply each net substrate area by its specified coat count.
Primer, spot-primer, and finish coats should remain separate order lines when products differ.
Use realistic coverage inputs
Divide coat area by the selected product's stated coverage and round to available container sizes.
Rough siding, masonry, spraying, wind, and back-rolling can change field consumption.
Retain a field verification step
Check repaired areas, moisture condition, substrate preparation, and color changes before final ordering.
The area calculation does not determine coating suitability.